“Latvall-Jaunlūči”


BM Holding SIA – started its operations on 5 July 2011. Location “Latvall-Jaunlūči” Iecava. A biogas plant with an electrical capacity of 1.95 megawatts. Sewage sludge, bird manure, fiber, slurry are also used to generate electricity. The heat produced is used for heating the city of Iecava.